DC fast chargers entered a dense build-out phase in 2026, with single-gun power rising from 120 kW to well above 240 kW and the number of power modules inside the same cabinet footprint roughly doubling. Many integrators still manage fastening as a single process step, applying one torque table to every joint in the cabinet. The result shows up in the field as two very different failures: module over-temperature, and arcing from loose gun-cable terminals. These fasteners obey different physical constraints, and a shared parameter set always sacrifices one of them.
Screws inside a DC charger fall into two failure classes. One fails as heat: the clamp screws between power module and heatsink, mostly M2.0 to M2.5. The other fails as electricity: the current-carrying bolts linking busbars, gun-cable terminals and breakers, M6 and above. A third group sits between them — the M1.6 to M2.0 screws on control boards, metering and communication modules, and display brackets. They neither dominate heat transfer nor carry heavy current; they fail as board-level vibration loosening and connector contact loss. Mixing all three into one table usually ends with module torque applied to terminals, or the reverse.
The clamp screw on a power module does not control clamping force as such; it controls the interface thermal resistance between die and heatsink. Across the usable torque band, junction temperature can shift by several degrees, but once torque exceeds what the aluminium heatsink thread can bear, the thread yields and clamp force decays faster under thermal cycling. The window is therefore pinched from both sides: the lower bound comes from the minimum compression of the interface material, the upper bound from aluminium thread strength and the uniformity of multi-point stepped preload. Repair makes this harder still — different power classes and different vendors place screws differently, so manual alignment during changeover is slow and easy to miss. That is why vision positioning has moved into module repair stations: an automatic vision screw removal machine reads the module outline and screw array first, then loads the matching removal sequence, cutting changeover from hours to minutes.
For current-carrying joints on DC gun cables, acceptance is based on contact resistance and terminal temperature rise at full load. Torque is only an intermediate variable. This is frequently misunderstood: tightening to the upper limit does not lower contact resistance and may raise it, because the busbar deforms and effective contact area drops. Long-term stability comes from anti-loosening measures — disc springs, double nuts, threadlocker, and proper preparation of the mating faces. Repair makes the point sharper: a reopened terminal needs a new disc spring and fully cleaned, re-applied threadlocker, otherwise contact resistance after reassembly exceeds the original state. The small screws on control and metering boards follow a different logic entirely: numerous, small, frequently cycled, and better handled at a fixed station. Here small screw removal equipment serves to move disassembly off the field and back into the workshop.
Sealing reliability above IP54 is driven mainly by tightening sequence and step ratio. A gasket is a closed loop; a single screw at nominal torque only guarantees compression near that point, and uniformity around the loop depends on diagonal stepping — typically fifty, eighty, then one hundred percent along a symmetric path. Most water-ingress cases traced in the field are not under-torque but wrong sequence, which shifts the gasket to one side, or a flange with excessive flatness error. Repairing such enclosures at volume involves twenty to thirty screws, where manual sequenced removal is neither consistent nor recordable. The M0.8-M2.0 screw removal solution addresses this by writing sequence, torque and cycle count into the program, turning "in order" into machine behaviour rather than operator memory.
Replacing a gun cable on site and repairing a power module in the workshop are different processes. Field work has limited access, uncontrolled cleanliness, and screws that are essentially never reused; the goal is fast return to service plus a cycle-count record. Workshop repair has fixtures, a clean station and torque traceability; the goal is restoring the module to a re-installable state, which requires evaluating heatsink thread wear and replacing interface material. Merging the two usually produces field work that is too crude and workshop work that is too casual. For equipment builders this means one removal platform must ship different parameter sets for the two conditions, not one set applied everywhere.
For a supplier such as Honred Technology, the incremental demand from charging infrastructure is not larger screws but more mixed models and stricter cycle traceability. The size range of in-cabinet screws is narrow; the difficulty is many models, small batches, and repair sharing tooling with production — a situation very close to what 3C electronics faced years ago.