China Region Telephone

18688976300
News
Service Hotline

18688976300

Mobile: 18688976300 (Mr. Peng) 15222276387 (Mr. Bai)

Email: pengwl@honred.com

QQ: 176496342

Address:Building A1, Runteng Industrial Park, Shiyan Street, Bao'an District, Shenzhen

Screw Removal Sequence and Stress Release: Why You Cannot Just Work Around the Circle

Date: 2026-11-10       Views: 10

When a machine is reworked or torn down, which screw comes out first looks like a minor detail, but it actually decides how much distortion remains in the part afterwards. In plates, housings and sealing flanges held by multiple screws, the fasteners are elastically coupled: the preload of each screw is transferred through the part body to its neighbours. With an arbitrary removal order, the part suddenly loses restraint on the last few screws and releases the elastic deformation accumulated earlier as plastic deformation. Dimensions shift, and the reworked part no longer fits or no longer seals.

Removal Sequence Is Not a Habit, It Sets the Final Distortion of the Part

The principle is simple: the goal of dismantling a multi-screw joint is not to get the screws out, but to withdraw the preload in a controlled way. Removing one screw withdraws a concentrated load at that location, and the load carried by the remaining screws is redistributed. With a sensible order the load path is gradual; with a random one, local overload appears, and thin-walled parts are the most prone to irreversible warping at that stage.

Engineering calls this stress release, and its magnitude is not trivial. On a 300 mm square aluminium alloy plate fixed with twelve M2 screws, removing sequentially from one end to the other can leave a residual distortion difference of 0.1 to 0.3 mm between the two ends. Breaking the same joint down diagonally in stages keeps it within 0.05 mm. For optical parts, sealing faces and precision guide mounting surfaces, that difference decides whether the job succeeds.

Three Ground Rules: Diagonal, Staged, Loosen Before Removing

The first is diagonal. Whether the joint has four, six or twelve screws, the removal order should follow geometric symmetry: a cross for four, a star skipping one position for six, and position skipping around an even ring for larger counts. The purpose is to apply each unloading round at symmetric locations and avoid a bending moment on one side.

The second is staged. Do not drive one screw all the way out in a single pass. The correct method is two to three rounds, in each of which every screw is loosened by a fixed angle or a fixed number of turns, reducing preload step by step. The first round usually takes about thirty percent of the full thread travel and only has to break the joint loose, not remove the screw.

The third is loosen before removing. Only after every screw has been pre-loosened and the preload is essentially zero should the screws be backed out one by one. At that point the axial load is small, the removal torque is mainly friction torque, and the risk of cam-out drops sharply. For corroded or threadlocked joints, penetrants or controlled heating can be applied during the pre-loosening stage, moving breakaway risk forward into a step that can be managed.

Thin-Wall Parts and Sealing Faces: A Wrong Order Leaves Permanent Residual Stress

Thin-wall parts have low stiffness and are especially sensitive to the load path. Phone mid-frames, optical barrels, battery trays and sensor housings all belong to this group. Their common feature is that there is not enough material to absorb local overload; once a single screw is forced out on its own, the part yields locally, and even a correct reassembly will not restore the original flatness.

Sealing faces are worse, because the problem often only shows up after the teardown. If the screws evenly distributed on a flange are removed out of order, the gasket is locally stretched and sheared, developing micro-cracks or permanent compression set that cannot be seen. When the joint is reassembled with a new gasket and the specified torque, leakage can still occur because the flange body is no longer flat. Such rework is easily misdiagnosed as a gasket quality issue when the root cause sits in the disassembly step.

Where the sequence has to be executed reliably at the teardown stage, the equipment-side answer is to parameterise it. In the removal program of a small screw removal equipment, screw coordinates are arranged into symmetric groups, each with its own pre-loosening angle and spindle speed, so that diagonal staged loosening becomes a fixed program action rather than operator experience. On machines whose vision system can identify screw condition, the angle of each screw after pre-loosening can be checked against the expected band to flag a seized screw early.

Pre-Treatment of Large Screw Groups: Pre-Loosening, Grouping and Pacing

Where a joint has more than twenty screws, ordering rules alone are not enough; grouping is also needed. A common practice is to group screws by structural function, for example primary load-bearing, sealing and secondary fixing, then process the secondary group first, the sealing group next and the primary group last. The unloading path is then the reverse of the loading path during assembly, which satisfies the mechanical principle of reversibility.

Pacing matters as well. Removing a dozen screws in rapid succession leaves the part body no time to redistribute stress, and local temperature rise also changes the softened state of threadlocker. Allowing a few seconds between pre-loosening rounds controls distortion better than simply speeding up the teardown.

Across the M0.8-M2.0 range the margin of removal torque the screw itself can absorb is small, so control accuracy during pre-loosening largely determines whether the screw can be backed out cleanly afterwards. The value of a vacuum-adhesion automatic vision screw removal machine at such a station is not only accurate positioning: it also logs the pre-loosening angle, removal torque and axial displacement of each round, producing traceable evidence that the sequence was followed. With that data, whether the order was right no longer depends on human judgement.

Putting the Sequence into the Process Card: A Four-Step Method

Step one, derive the removal order from the assembly order in reverse. The tightening sequence already accounts for distortion control, so reversing it is the cheapest starting point.

Step two, break the reverse order into rounds. Define the number of rounds, the loosening angle per round and the dwell time between rounds as explicit numbers, not as loosen it in a few passes.

Step three, build separate rules where the size spread is wide. When a part carries both M0.8 and M2.0 screws, pure geometric symmetry is not enough: small screws have less torque margin and should be loosened after the large ones, so they are not over-compressed while preload is redistributed.

Step four, close the loop with first-article validation. After teardown, measure the flatness of the critical face or the contact band of the sealing face and compare with the pre-teardown data. If the deviation exceeds the limit, return to step two and adjust rounds and angles. Making this validation a standard action is what gives the sequence parameters a basis instead of copying them from elsewhere.

For batch rework, a complete M0.8-M2.0 screw removal solution should cover three elements together: sequence planning, torque window definition and post-removal inspection. Solving only the ability to get the screw out leaves the rework rate where it was. Only when the sequence becomes an executable, verifiable and traceable process parameter is disassembly quality genuinely under control.